Afshar, A, Ziaraty, A K, Kaveh, A and Sharifi, F (2009) Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization. Journal of Construction Engineering and Management, 135(07), 668–74.

Cha, H S, Kim, J and Han, J (2009) Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects. Journal of Construction Engineering and Management, 135(07), 647–56.

Cheng, G and Wilmot, C G (2009) Louisiana Highway Construction Cost Trend after Hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(07), 594–600.

Hale, D R, Shrestha, P P, Gibson, G E and Migliaccio, G C (2009) Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods. Journal of Construction Engineering and Management, 135(07), 579–87.

Kanit, R, Gunduz, M and Ozkan, O (2009) Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects. Journal of Construction Engineering and Management, 135(07), 609–13.

Lin, P, Lee, W and Lee, M (2009) Exploring Problems and Undesired Effects in the Construction Development Process: The Case of a Small- to Medium-Sized Developer in Taiwan. Journal of Construction Engineering and Management, 135(07), 560–9.

Ling, F Y and Gui, Y (2009) Strengths, Weaknesses, Opportunities, and Threats: Case Study of Consulting Firms in Shenzhen, China. Journal of Construction Engineering and Management, 135(07), 628–36.

Miller, L, Mannering, F and Abraham, D M (2009) Effectiveness of Speed Control Measures on Nighttime Construction and Maintenance Projects. Journal of Construction Engineering and Management, 135(07), 614–9.

Perkins, R A (2009) Sources of Changes in Design–Build Contracts for a Governmental Owner. Journal of Construction Engineering and Management, 135(07), 588–93.

Wan, S K, Kumaraswamy, M M and Liu, D T (2009) Contributors to Construction Debris from Electrical and Mechanical Work in Hong Kong Infrastructure Projects. Journal of Construction Engineering and Management, 135(07), 637–46.

Watkins, M, Mukherjee, A, Onder, N and Mattila, K (2009) Using Agent-Based Modeling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew Interactions. Journal of Construction Engineering and Management, 135(07), 657–67.

Yang, J and Yin, P (2009) Isolated Collapsed But-For Delay Analysis Methodology. Journal of Construction Engineering and Management, 135(07), 570–8.

  • Type: Journal Article
  • Keywords: Construction management; Scheduling; Claims; Liability; Analytical techniques; Dispute resolution; Delay time;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000016
  • Abstract:
    Schedule delays are common in construction projects. Although many methods have been developed for analyzing and measuring schedule delays for construction projects, each method has functional limitations and use prerequisites. No one method is acceptable for all project participants under all circumstances. This study presents the isolated collapsed but-for (ICBF) method, an innovative delay analysis method for construction projects. During analysis, the ICBF method requires as-planned and as-built schedules as well as identified liability documents with key delay events to perform its analysis approach. Based on its application to an illustrative case and comparisons with other methods, the ICBF method is effective for delay analysis. Results provided by the proposed method can be easily traced to the actual case in an as-built schedule.

Zhu, Y, Ahmad, I and Wang, L (2009) Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects. Journal of Construction Engineering and Management, 135(07), 601–8.

Zou, P X and Zhang, G (2009) Comparative Study on the Perception of Construction Safety Risks in China and Australia. Journal of Construction Engineering and Management, 135(07), 620–7.